CEE 577 |
Fall 2017 |
Click on L# to see full Overheads or P# to see printable version (2 slides/pg)
Date |
Day |
L# |
P# |
Lecture |
Homeworks |
Reading |
Notes |
6 Sep |
W |
I. Introduction
·
Course overview & administration;
regulations
|
|
Chapra L1 |
|
||
8 Sep |
F |
·
Mass Balance & Kinetics
|
|
Chapra L2 |
|
||
11 Sep |
M |
·
Hydrological Measurements
|
|
|
|||
13 Sep |
W |
II. Lake Models
·
Steady state solution
|
|
|
|||
15 Sep |
F |
No Class
|
|||||
18 Sep |
M |
·
General
Modeling
|
|
Chapra L4 |
|
||
20 Sep |
W |
·
General
Modeling
·
Particular
Solutions
|
Chapra L29 (1st half) |
|
|||
22 Sep | F | ||||||
25 Sep |
M |
·
Particular Solutions
(cont.)
·
Phosphorus lake
models
|
handout |
|
|||
27 Sep |
W |
Field Trip to Mill River |
8:00-11:00
|
||||
29 Sep |
F |
·
Export Coefficients
·
Lake Higgins
example
|
Chapra L8 |
|
|||
2 Oct | M |
·
Diffusion/dispersion
|
Chapra L14 |
|
|||
4 Oct |
W |
·
Hydrographs
· Low flows, dispersion |
|
Chapra L14 |
|
||
6 Oct |
F |
·
Model
development |
Chapra L9 |
|
|||
9 Oct |
M |
No Class – Columbus Day
|
|
||||
10 Oct |
Tu |
No Class – Travel Day
|
|
||||
11 Oct |
W |
·
Distributed
Systems Waste ·
Load Allocation |
|
|
|||
|
|
·
BOD and DO |
Chapra L19 |
|
|||
13 Oct |
F |
No Class – WINSSS meeting
|
|
||||
16 Oct |
M |
·
Gas Transfer |
|
Chapra L20 |
|
||
|
|
·
Reaeration
|
|
Chapra L21 |
|||
18 Oct |
W |
·
Streeter-Phelps:
Point Sources |
Chapra L21 & L22 |
|
|||
|
|
·
Streeter-Phelps:
Distributed Sources ·
Streeter-Phelps:
Nitrogen & P/R |
Chapra L23 |
|
|||
|
|
·
Photosynthesis
& methods |
|
Chapra L24 |
|
||
|
|
·
Sediment Oxygen
Demand |
|
Chapra L25 |
|
||
|
|
·
Dye Studies |
|
Chapra L10 |
|
||
|
|
·
Algal Modeling |
Chapra L28 & L33 (parts) |
|
|||
|
|
·
QUAL2K
|
|
Chapra L26 |
|
||
|
|
·
Thermal Modeling
· Numerical solutions |
Chapra L30 |
|
|||
|
|
IV. Lakes
Revisited
· Thermal Stratification |
|
Chapra L7 |
|
||
|
|
·
|
Chapra L16 | ||||
|
|
·
|
Chapra L29
|
||||
|
|
·
|
Chapra L29 |
|
|||
|
|
Mid-term EXAM (7:00 PM) Mrst 15
|
Through end of Lecture #22
|
||||
|
|
·
Stratified Lakes, Empirical
models
|
DP#1, part 2 due, |
|
|
||
13 Nov | M | No Class; travel days, WQTC | |||||
15 Nov | W | ||||||
|
|
29 |
29 |
V. Toxics Models
·
partitioning |
|
|
|
Thanksgiving Break
|
|||||||
27 Nov | M | No Class, NYC symposium | |||||
|
|
·
Toxics: Lake
Models
|
|
Chapra L41 |
|
||
|
|
·
Toxics: River
Models
|
|
Chapra L42
|
|
||
|
|
·
Toxics:
volatilization |
|
Chapra L43 |
|
||
|
|
·
Toxics:
hydrolysis, photolysis |
|
|
|
||
|
|
·
Simplified
models |
DP#2 part 1A
|
|
|
||
|
|
·
Toxic Models:
PCBs in Great Lakes |
DP#2 part 1B |
Handouts |
|
||
|
|
·
Toxic Models:
EDCs |
|
Handouts |
|
||
|
|
VI. Special
Topics
·
Non-point
source models |
DP#2 part 1C |
Handouts |
|
||
|
|
·
Case Study:
Aldrin in Iowa reservoir
|
|
Handouts
|
|
||
|
|
·
TMDLs
|
DP#2 part 2A |
Handouts
|
|
||
|
·
PPCP &
Flame Retardants |
|
|
|
|||
|
·
TOC/THMFP
models I |
|
|
|
|||
|
·
TOC/THMFP
models II |
|
|
|
|||
|
|
Final Report for DP#2 Due |
|
[1] Tentative, subject to change; if necessary extra classes may be scheduled at 2:30 one either Tu, Th or F.