UMass Amherst YouMass People Finder
2004-2005 SMV Team

 

The Body Team

Team Schedule

Assembling the body sections on the chassis, May 2005.


Sean and Chiu ribbing the shell for added strength


The bottom of the body ribbed for support


The Fiberglass Shell

Fiberglassing

Observing All Safety Requirements


Plastering and the final body mold, March 2005

Assembling and gluing the foam sections together, February 2005


Current Chassis Set-up, February 2005


The rack-and-pinion steering.

The back wheel attached to the chassis and the fire extinguisher set-up.


The Chassis: fabricated out of light-weight rectangular aluminum tubing.
Due to its low stance, this design lowers the overall center of gravity for the vehicle.


Katie cross-drilling the roll bar to reduce weight


Experimenting with various techniques to shape the windshield.


Preliminary design work for this years body was done by building "mock" frame
designs out of wood which gave us an idea of the body position of the driver and possible
dimensions of the frame.

Fitting Katie to the frame

Mock frame with sling style seat

Sean getting a feel for the frame

Observing all safety requirements


About the Competition Team Photo Team Members Advisor
Rules Sponsors Body Team Engine Team Fuel Injector Team 2003-2004

Questions and Comments contact Webmaster: clinehan@student.umass.edu