MIE 318: Automatic Unloading Toaster
Oven


Project Schedule

· Lay out drawing (04/20/96)

· Engineering specification (04/29/96)

· Detailed drawing (05/07/96)

· Feasibility analysis (05/10/96)

· Assembly drawing (05/15/96)

· Final report (05/24/96)

· Presentation (05/24/96)