Team 16 - Viano

Preliminary Design Review (PDR)

Covers the project’s problem statement, requirement specifications, system-level block diagram and project specifications, as well as the team’s proposed MDR prototype specifications.

Download »

Midway Design Review (MDR)

The hardware and/or software prototype presented demonstrates that the chosen design path is likely to lead to a completed project in April which meets or exceeds the project specifications.

Download »

MDR Report

Technical report that contains all the information on design, design tradeoffs, analysis results, implementation details, etc.

Download »

Comprehensive Design Review (CDR)

The prototype at the CDR should demonstrate all major functionality of the finished project

Download »

Final Project Review (FPR)

At FDR, teams present their completed system and its functionality. Teams should lay out how the prototyped software/hardware meets project specifications.

Download »

SDP 15 Poster

Teams present their final prototype with posters as presentation aids. Teams are judged for their overall accomplishments and presentation skills.

Download »