Covers the project’s problem statement, requirement specifications, system-level block diagram and project specifications, as well as the team’s proposed MDR prototype specifications.
The hardware and/or software prototype presented demonstrates that the chosen design path is likely to lead to a completed project in April which meets or exceeds the project specifications.
Technical report that contains all the information on design, design tradeoffs, analysis results, implementation details, etc.
The prototype at the CDR should demonstrate all major functionality of the finished project
At FDR, teams present their completed system and its functionality. Teams should lay out how the prototyped software/hardware meets project specifications.
Teams present their final prototype with posters as presentation aids. Teams are judged for their overall accomplishments and presentation skills.