ECE 597D
Spring 2005
updated (16 May2005)
Documents
- Course Organization and Syllabus (posted 26 Jan 2005)
- Spectrum Article on Bavarian Solar Park (posted 30 Jan 2005)
- Steinmetz Biography (posted 2 Feb 2005)
- Notes on Problem 3-22 (posted 22 March 2005)
Homework Teams
Transformers
Generators
Motors
Transmission Lines
FLANAGAN
GARCIA
KROUK
ASERMELY
IBE
BARISH
CAHILL
DEANDREA
NG
SANTOS
DIBENEDETTO
RAY
COLEMAN
TATAR
GERRISH
MONTOYA
GRIFFEN
SHEA
FENSTAD
FETTES
HORTON
Date Issued Due Date Team Assignment Solutions Fri, 28 Jan 05
HW1 Mon, 7 Feb 05 Motors 1-4, 1-5, 1-6, 1-8, 1-9, 1-10, 1-14, 1-16, 1-17, 1-18 Solution 1 HW2 Wed, 16 Feb 05 Generators 2-1 – 2.6 Solution 2 HW3 Transformers 3-1 – 3.8 Solution 3 HW4 Transmission Lines 3-9, 3-13, 3-14, 3-22, 4-4 Solution 4 Fri, 25 Mar 05 All Midterm HW5 Mon, 4 April 05 Motors 4-1, 4-2, 4-3, 4-5, 4-6,
5-2, 5-3(a,b), 5-4Solution 5 HW6 Fri, 15 April 05 Generators 5-19, 5-22, 5-23, 5-24, 5-27
7-2, 7-4Solution 6 HW7 Wed, 27
April 05
Transformers 7-7, 7-8, 7-9, 7-10, 7-11
Note: Teams (excluding Transformers) can be exempted from HW 7 by doing show and tell with either a (physical) synchronous motor, synchronous generator, or induction motor. The machine should be disassemblable, and the team should be able to describe it in full.Solution 7 HW8 Wed, 4
May, 05
Transmission Lines 8-3 - 8.9 Solution 8 HW9 5pm, Thur 12
May, 05
ALL
9-15 (motors),
9-16 (generators)
10-5 (transmissions lines),
10-9 (transformers)
Teams submit solution to only their assigned problem.Solution 9 Final Sample of pre-final lock-in grade here. Will be updated for HW #9 by ~9pm Friday, 13th May. Send instructor decision to lock-in final grade by 10am, Monday, 16th May. Default is to take final exam Final Exam will be posted here ~11am, Monday, 16th May
Final