See Other Tours
 

CEE434 Students toured the New Engineering Building
The tour was led by Tom Shaw of the UMass Planning Office

         

Those who were around during the summer saw the construction of the foundations (shown below) - note the long reach of the pour when the concrete is pumped into place rather than just dumped.


               
 
 

      
       

CEE434 Tour

Steel Erection

Final Building

See Other Tours

Return to Home Page